Who must design structural ramps used by employees as access or egress from excavations?
Correct Answer
A) A competent person qualified in structural design.
OSHA requires structural ramps used by employees to be designed by a competent person qualified in structural design.
Why This Is the Correct Answer
OSHA requires structural ramps used by employees to be designed by a competent person qualified in structural design.
Why the Other Options Are Wrong
Option B: Make any laborer on the crew the answer for ramp structural design
Choice B (Any laborer on the crew) is rejected because the option does not produce the required Ramp structural design outcome, A.
Option C: Base the ramp structural design response on the equipment rental clerk only
In site construction, Only the equipment rental clerk is the wrong selection for Ramp structural design: it leaves the work at an informal or incomplete stage, while Ramp structural design requires A.
Option D: Treat the condition as requiring no design is needed
The trap in D is No design is needed. That selection is wrong because it answers the Ramp structural design prompt with the wrong practical move.
Memory Technique
Make ramp structural design a tabbed card: cite the exact condition, then choose A competent person qualified in structural design.
Reference Hint
Open OSHA 29 CFR 1926 Subpart P; EPA Construction General Permit concepts where applicable; use OSHA 1926.651(c)(1) to confirm that OSHA requires structural ramps used by employees to be designed by a competent person qualified in structural design.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass
