As the long-lead tracker is updated, what minimum slope is commonly used for 4 in. gravity drainage pipe?
Correct Answer
A) 1/8 in. per ft
1/8 in. per ft is the controlling requirement: the distractors are related-looking contract or field terms, but they do not match the cited requirement for review item 56.
Why This Is the Correct Answer
1/8 in. per ft is the controlling requirement
Why the Other Options Are Wrong
Option B: 1/16 in. per ft; without required sediment or excavation control
The trap in B is 1/16 in. per ft; without required sediment or excavation control. That selection is wrong because 1/16 in. per ft; without required sediment or excavation control is a different drainage slope than the pipe size in the item; the accepted slope is 1/8 in.
Option C: 1/4 in. per ft
Choice C gives 1/4 in. per ft. Its specific error: 1/4 in. per ft is a different drainage slope than the pipe size in the item; the accepted slope is 1/8 in. per ft. The accepted answer is 1/8 in. per ft.
Option D: 1/2 in. per ft
Choice D (1/2 in. per ft) is rejected because 1/2 in. per ft is a different drainage slope than the pipe size in the item; the accepted slope is 1/8 in. per ft. The cited answer is 1/8 in. per ft.
Memory Technique
Make larger drain slope a tabbed card: cite the exact condition, then choose 1/8 in. per ft.
Reference Hint
Open Pipe and Excavation Contracting, 2011; use the index entry or section for "Gravity drainage slope for 3-6 in. pipe" to confirm that 1/8 in.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass
Related Study Resources
Previous Question
A sealant subcontractor prices 1,260 lf of control joints. The bid includes 8 percent extra for mockups, corners, and waste. What linear footage should be carried?
Next Question
Rigid insulation boards on an exterior wall have open gaps and unsealed joints where the air barrier detail requires continuity. What correction is appropriate?