A crew places a 24-inch backfill lift where the compactor is approved for 8-inch lifts. What should be done?
Correct Answer
C) Remove or rework material into acceptable lift thickness and compact/test again.
Too-thick lifts may not compact throughout their depth and must be reworked.
Why This Is the Correct Answer
Too-thick lifts may not compact throughout their depth and must be reworked.
Why the Other Options Are Wrong
Option A: Select compact only the top surface for backfill lift too thick
The trap in A is Compact only the top surface. That selection is wrong because the option delays or omits the controlling step.
Option B: Handle backfill lift too thick by choosing to place pavement immediately
Choice B gives Place pavement immediately. Its specific error: it leaves out the controlling Backfill lift too thick result: Remove or rework material into acceptable lift thickness and compact/test again.
Option D: Apply mark it as an allowance to the backfill lift too thick condition
In site construction, Mark it as an allowance. is the wrong selection for Backfill lift too thick: the option does not produce the required Backfill lift too thick outcome, Remove or rework material into acceptable lift thickness and compact/test again.
Memory Technique
Picture a redline on the jobsite; backfill lift too thick is solved by the action that leads to Remove or rework material into acceptable lift thickness and compact/test again.
Reference Hint
Open Pipe and Excavation Contracting, 2011; use by topic index - bedding / backfill / compaction to confirm that Too-thick lifts may not compact throughout their depth and must be reworked.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass
