A tempered glass panel is 5 ft by 9 ft. The supplier weight is 6.5 lb per square foot. What is the panel weight before hardware?
Correct Answer
B) 292.5 lb
Panel area is 5 x 9 = 45 sf. Weight is 45 x 6.5 = 292.5 lb. Other choices use the wrong panel area or a different pounds-per-square-foot value.
Why This Is the Correct Answer
Panel area is 5 x 9 = 45 sf. Weight is 45 x 6.5 = 292.5 lb. Other choices use the wrong panel area or a different pounds-per-square-foot value.
Why the Other Options Are Wrong
Option A: Make 260 lb the answer for glazing panel weight
glazing panel weight, choice a: 260 lb backs into 40 when divided by 6.5; the accepted setup gives 45 on that same base.
Option C: Apply 315 lb to the glazing panel weight condition
glazing panel weight, choice c: 315 lb backs into 35 when divided by 9; the accepted setup gives 32.5 on that same base.
Option D: Apply 360 lb to the glazing panel weight condition
glazing panel weight, choice d: 360 lb backs into 40 when divided by 9; the accepted setup gives 32.5 on that same base.
Memory Technique
Keep a redline beside glazing panel weight: if one number is skipped, the option drifts away from 292.5 lb.
Reference Hint
Open Principles and Practices of Commercial Construction, 11th Ed., 2024; use the index entry or section for "Glazing panel weight calculation" to confirm that Panel area is 5 x 9 = 45 sf.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass
