What is the purpose of gypsum board control joints?
Correct Answer
D) Relieve stresses from movement and limit cracking
Gypsum board control joints relieve stresses from movement and help limit cracking in large or interrupted surfaces.
Why This Is the Correct Answer
Gypsum board control joints relieve stresses from movement and help limit cracking in large or interrupted surfaces.
Why the Other Options Are Wrong
Option A: Use gypsum control joints to increase pipe slope in concealed chases
Choice A gives Increase pipe slope. Its specific error: it solves the wrong trade problem; the field result tied to Gypsum control joints is Relieve stresses from movement and limit cracking.
Option B: Use gypsum control joints to replace fire dampers in rated corridors
Choice B (Replace fire dampers) is rejected because the option tries to substitute, waive, or delete the Gypsum control joints control; the item instead requires Relieve stresses from movement and limit cracking.
Option C: The finish crew should use gypsum control joints to support roof joists at board joints
In finishes, Support roof joists is the wrong selection for Gypsum control joints: it describes work from another assembly, while the Gypsum control joints item is asking for Relieve stresses from movement and limit cracking.
Memory Technique
Make gypsum control joints a tabbed card: cite the exact condition, then choose Relieve stresses from movement and limit cracking.
Reference Hint
Open Gypsum Construction Handbook, 7th Ed., 2014; use the index entry or section for "Gypsum Construction Handbook - fastening / control joints / repair" to confirm that Gypsum board control joints relieve stresses from movement and help limit cracking in large or interrupted surfaces.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?