What is the purpose of a capillary break in a building enclosure assembly?
Correct Answer
A) To interrupt moisture movement through small pores or contact paths
A capillary break interrupts the small-pore or contact path that can draw liquid water through materials. Other choices describe structural, fastening, or fire properties rather than capillary moisture control.
Why This Is the Correct Answer
A capillary break interrupts the small-pore or contact path that can draw liquid water through materials. Other choices describe structural, fastening, or fire properties rather than capillary moisture control.
Why the Other Options Are Wrong
Option B: Use capillary break to increase structural live load capacity
Choice B (To increase structural live load capacity) is rejected because it leaves out the controlling Capillary break result: To interrupt moisture movement through small pores or contact paths.
Option C: Use capillary break to replace all fasteners in a roof assembly
In thermal and moisture protection, To replace all fasteners in a roof assembly is the wrong selection for Capillary break: it treats Capillary break as optional.
Option D: Use capillary break to make insulation noncombustible
The trap in D is To make insulation noncombustible. That selection is wrong because the option does not produce the required Capillary break outcome, To interrupt moisture movement through small pores or contact paths.
Memory Technique
Use capillary break as the label and To interrupt moisture movement through small pores or contact paths as the definition to recall under pressure.
Reference Hint
Open Principles and Practices of Commercial Construction, 11th Ed., 2024; use the index entry or section for "Building enclosure moisture-control concepts" to confirm that A capillary break interrupts the small-pore or contact path that can draw liquid water through materials.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?