A storm inlet lacks protection while disturbed soil drains toward it. What is the correction?
Correct Answer
C) Install inlet protection before sediment reaches the storm sewer
Inlet protection should be installed before sediment-laden runoff enters the storm sewer.
Why This Is the Correct Answer
Inlet protection should be installed before sediment-laden runoff enters the storm sewer.
Why the Other Options Are Wrong
Option A: The site crew should wait for paving
Choice A gives Wait for paving. Its specific error: it tries to bypass the Storm inlet missing protection checkpoint.
Option B: Base the storm inlet missing protection response on pump sediment downstream
Choice B (Pump sediment downstream) is rejected because it answers the Storm inlet missing protection prompt with the wrong practical move.
Option D: The site crew should remove the inlet
The trap in D is Remove the inlet. That selection is wrong because the choice would not get the project to Install inlet protection before sediment reaches the storm sewer, which is the Storm inlet missing protection result verified by the source; Unprotected storm inlets receiving sediment-laden runoff need inlet protection.
Memory Technique
Remember storm inlet missing protection by its jobsite consequence: the correct move points to Install inlet protection before sediment reaches the storm sewer.
Reference Hint
Open Developing Your Stormwater Pollution Prevention Plan, EPA 833-R-06-004, 2007; use the index entry or section for "EPA 833-R-06-004 - erosion and sediment controls" to confirm that Inlet protection should be installed before sediment-laden runoff enters the storm sewer.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?