A steel-erection connector is exposed to a fall of 34 feet to the lower level. Which threshold in OSHA 1926.760(b)(1) has been exceeded?
Correct Answer
C) More than two stories or 30 ft, whichever is less
Section 1926.760(b)(1) uses more than two stories or 30 feet above a lower level, whichever is less. A 34-foot fall exposure exceeds it. Connector training and the separate equipment/protection requirements at over 15 through 30 feet still apply; the threshold is not permission to disregard lower-height hazards. Source: https://www.osha.gov/laws-regs/regulations/standardnumber/1926/1926.760
Why This Is the Correct Answer
Section 1926.760(b)(1) uses more than two stories or 30 feet above a lower level, whichever is less. A 34-foot fall exposure exceeds it. Connector training and the separate equipment/protection requirements at over 15 through 30 feet still apply; the threshold is not permission to disregard lower-height hazards. Source: https://www.osha.gov/laws-regs/regulations/standardnumber/1926/1926.760
Independent practice; verify any reference hint against the edition and category permitted for your booking. Official exam and reference-list sources →
More NASCLA Questions
A contract permits payment for stored materials only with specified documentation. Which submission supports that payment review?
A tempered glass panel is 5 ft by 9 ft. The supplier weight is 6.5 lb per square foot. What is the panel weight before hardware?
The owner will buy major equipment directly, while the contractor remains responsible for coordination and installation. What must be clarified before the purchase is released?
Which minimum eccentric gravity load and distance does OSHA 1926.755(a)(2) specify for the column anchor-rod assembly during erection?
Using 1 refrigeration ton = 12,000 Btu/h, how many tons of cooling correspond to a scheduled capacity of 180,000 Btu/h?
On the supplied schematic practice drawing (S-741), what is the sum of the three printed chain dimensions? Use the dimension labels rather than scaling the sloping graphic.
Why are backfill lifts limited in thickness?
The specified resilient flooring and adhesive require slab moisture and pH checks before installation. Testing has not been completed, but the crew wants to meet turnover. What should happen?
The approved backfill procedure limits loose lifts to 8 inches for this soil and compactor. A crew places one 24-inch loose lift. What should be done?
Under 2021 IBC 1507.7.2, what is the minimum roof-deck slope for natural slate shingles?
People Also Study
Business & Financial Management
120 questions · 70% to pass
Contract Administration
60 questions · 70% to pass
Project Management
60 questions · 70% to pass
Related Study Resources
Previous Question
What minimum force is specified by 29 CFR 1926.502(b)(5) for a construction guardrail midrail, without failure, at any point in an outward or downward direction?
Next Question
A schedule update shows that the activity delaying turnover sits on the critical path, while another late activity still has ten days of float. Where should recovery planning focus first?