A shutdown will affect occupied restrooms in an adjacent area. What is the correct control?
Correct Answer
D) Plan notice, duration, temporary service, approval, and restoration responsibilities.
Utility shutdowns need coordinated notice and temporary measures where occupants are affected.
Why This Is the Correct Answer
Utility shutdowns need coordinated notice and temporary measures where occupants are affected.
Why the Other Options Are Wrong
Option A: Turn off water without notice
Choice A (Turn off water without notice.) is rejected because the action skips the timing, documentation, or field-control step needed for Temporary water shutdown.
Option B: Record it only as a warranty item
In general project requirements, Record it only as a warranty item. is the wrong selection for Temporary water shutdown: it tries to bypass the Temporary water shutdown checkpoint.
Option C: Ask the supplier to approve the shutdown
The trap in C is Ask the supplier to approve the shutdown. That selection is wrong because it leaves out the controlling Temporary water shutdown result: Plan notice, duration, temporary service, approval, and restoration responsibilities.
Memory Technique
Pair temporary water shutdown with the real field trigger, then choose the response that produces Plan notice, duration, temporary service, approval, and restoration responsibilities.
Reference Hint
Open Construction Jobsite Management, 5th Ed. (2024); use by topic index - meetings / coordination / action items to confirm that Utility shutdowns need coordinated notice and temporary measures where occupants are affected.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?
People Also Study
Business & Financial Management
120 questions · 70% to pass
Contract Administration
60 questions · 70% to pass
Project Management
60 questions · 70% to pass