California Class B Trade
CSLB Class B (General Building) trade exam covering core trades, framing and structural work, finish trades, safety, and planning and estimating. Closed book.
Content Areas
Core Trades
Concrete, masonry, roofing, plumbing, electrical, and HVAC fundamentals for general building work.
400Q available · 29% weight
Finish Trades
Drywall, paint, flooring, tile, cabinetry, and other interior finish work.
280Q available · 20% weight
Framing & Structural
Wood framing, shear walls, seismic requirements, foundations, and structural connections.
280Q available · 20% weight
Safety
Fall protection, excavation and trenching, scaffolding, and Cal/OSHA jobsite rules.
240Q available · 17% weight
Planning & Estimating
Plan reading, take-offs, material quantities, scheduling, and job estimating.
200Q available · 14% weight
Practice Questions
Core Trades
400QA 2-inch horizontal sanitary branch must be installed at 1/4 inch fall per foot. What total fall is needed over a 24-foot run?
mediumA 4-inch building drain is laid out with a required 1/8 inch fall per foot. What fall is required across 40 feet?
mediumA rooftop unit schedule shows 3 tons of cooling. Using 12,000 Btu per hour per ton, what cooling capacity is this?
mediumA pump motor is listed as 2 horsepower, and the coordination table asks for watts. Using 746 watts per horsepower, what is the approximate motor power?
mediumA slab is 30 feet long, 18 feet wide, and 4 inches thick. How many cubic yards of concrete are needed before waste?
mediumA footing is 80 feet long, 2 feet wide, and 12 inches deep. How many cubic yards of concrete are required before waste?
mediumA patio subgrade must drain at 2 percent away from the building for 20 feet. What total drop is required?
mediumA building pad needs 150 compacted cubic yards of fill. If the borrow material shrinks 10 percent after compaction, about how many loose cubic yards should be hauled in?
mediumA roofing estimate shows 2,850 square feet of roof area. How many roofing squares is that?
mediumA waterproof deck surface is 14 feet deep and must slope 1/4 inch per foot to the drain. What vertical fall is needed?
mediumA concrete housekeeping pad is 6 feet by 4 feet by 6 inches thick. How many cubic feet of concrete are needed before waste?
mediumA hydronic tank holds 120 gallons of water. Using 8.34 pounds per gallon, what water weight should be considered before placing it on a pad?
mediumA pressure gauge reads 18 psi on a low-pressure water test. Using 2.31 feet of head per psi, what head is represented?
mediumA 15-foot horizontal drain is set at 1/4 inch fall per foot. What total fall is required?
mediumA 240-volt heater draws 18 amperes. What is the operating wattage?
mediumAn HVAC system is listed at 36,000 Btu per hour. How many tons of cooling capacity is that?
mediumA crew plans to place a 20-foot by 12-foot slab at 4 inches thick. About how many cubic yards of concrete are needed before waste?
mediumA slab area is 18 feet by 14 feet, and the base rock layer is 4 inches thick. About how many cubic yards of base rock are needed before compaction loss?
mediumA swale must fall 2 percent over a 50-foot run. What vertical fall is required?
mediumA roof plane is 36 feet by 28 feet. How many roofing squares are required before waste?
mediumA shingle roof estimate requires 10 percent waste on 28 roofing squares. How many total squares should be ordered?
mediumA balcony waterproofing detail requires 1/4 inch slope per foot away from the building. What fall is needed over 10 feet?
mediumA 500-square-foot attic area receives insulation at $1.35 per square foot. What is the material cost?
mediumA pressure test reads 30 psi and the field conversion given is 2.31 feet of head per psi. What head is represented?
mediumA 3-inch horizontal sanitary drain is laid at 1/8 inch fall per foot. What fall is needed over 32 feet?
mediumA pump moves 18 gallons per minute. How many gallons does it move in 45 minutes?
mediumA 120-volt load draws 14 amperes. What wattage is the load using?
mediumAn exhaust fan is rated 90 cfm. How many cubic feet of air is moved in 20 minutes at that rate?
mediumA cooling unit is 48,000 Btu per hour. How many tons is that?
mediumA slab is 30 feet by 14 feet by 5 inches thick. About how many cubic yards of concrete are needed before waste?
medium+ 370 more questions
Finish Trades
280QIn the deck repair file, a stair trim package needs 34 pieces at $22 each. What material cost should be estimated?
mediumA wall has 640 square feet of drywall area. Using 4-foot by 8-foot sheets, how many sheets are needed before waste?
mediumA wall paint scope has 900 square feet and requires two coats. Paint covers 350 square feet per gallon per coat. How many gallons are needed before attic stock?
mediumA tile room is 8 feet by 10 feet, and 10 percent waste is added. How many square feet of tile should be ordered?
mediumA 16-foot by 14-foot room receives carpet with 12 percent waste. What square footage should be planned?
mediumAn L-shaped cabinet run has 11 linear feet on one wall and 8 linear feet on the other. A 3-foot appliance gap is excluded. How many linear feet of cabinets are installed?
mediumA shower floor must slope 1/4 inch per foot to the drain. What fall is needed over 4 feet?
mediumA wood floor area is 420 square feet. Material costs $7.25 per square foot, and waste is 8 percent. What material cost should be estimated?
mediumA room has 58 linear feet of baseboard. The trim costs $2.85 per linear foot. What is the material cost before waste?
mediumA room is 18 feet by 12 feet. Flooring waste is 5 percent. How many square feet should be ordered?
mediumA cabinet crown molding run is 24 feet long, and 12 percent waste is added for cuts. How many linear feet should be ordered?
mediumA bedroom wall has 760 square feet of paint area and needs primer plus two finish coats. If each coat covers 380 square feet per gallon, how many total gallons are needed before attic stock?
mediumA tile floor is 13 feet by 11 feet, with 12 percent waste. How many square feet should be ordered?
mediumA cabinet run is 21 linear feet, and installation labor is $68 per linear foot. What labor cost should be estimated?
mediumA room has 1,024 square feet of drywall surface. Using 4-foot by 8-foot sheets, how many sheets are needed before waste?
mediumA wood floor covers 360 square feet, and the installer adds 7 percent waste. What order quantity results?
mediumA 72-linear-foot crown molding run needs 10 percent waste. How many linear feet should be ordered?
mediumA patio finish slopes toward the building at 1/8 inch per foot for 12 feet. How much fall is directed toward the wall?
mediumA 420-square-foot resilient floor costs $4.35 per square foot, and 6 percent waste is added. What material cost is estimated?
mediumA repaint scope has 640 square feet of wall area and needs two coats. Paint covers 320 square feet per gallon per coat. How many gallons are needed before attic stock?
mediumA tile floor is 240 square feet, and each carton covers 12 square feet. How many cartons are needed before waste?
mediumA ceiling has 768 square feet of drywall area. Using 4-foot by 8-foot sheets, how many sheets are needed before waste?
mediumA flooring area is 520 square feet and requires 8 percent waste. How many square feet should be ordered?
mediumA 16-foot by 14-foot room needs baseboard around the perimeter, with one 6-foot opening excluded. How many linear feet are needed before waste?
mediumCabinet installation is priced at $74 per linear foot for 19 linear feet. What labor cost should be estimated?
mediumA closet is 9 feet by 6 feet. Flooring costs $4.80 per square foot. What material cost is estimated before waste?
mediumA paint scope needs 2,100 square feet of coverage. One gallon covers 350 square feet. How many gallons are required?
mediumA stair trim run needs 17 pieces at $22 each. What material cost should be estimated?
mediumA room needs 68 linear feet of crown molding, and each stick is 16 feet long. How many sticks are needed before waste?
mediumA shower wall has 96 square feet of tile area and uses 10 percent waste. How many square feet should be ordered?
medium+ 250 more questions
Framing & Structural
280QA 24-foot wall is framed with studs at 16 inches on center and a stud at each end. How many layout studs are needed before extra king or jack studs?
mediumA 36-foot wall is 8 feet high and will be sheathed with 4-foot by 8-foot panels installed vertically. How many full panels cover the wall before waste?
mediumA 12-foot ledger is laid out for deck joists at 16 inches on center with a joist at each end. How many joists are needed?
mediumA stair has a total rise of 105 inches. If the problem limit is a maximum 7.5 inches per riser, how many risers are needed?
mediumA stair layout has 13 treads at 10 inches each. What total horizontal run is needed?
mediumA 10-foot by 12-foot deck area is framed with decking that costs $4.80 per square foot. What is the decking material cost before waste?
mediumA hip roof plane is 30 feet by 16 feet. How many square feet of sheathing does that rectangular plane require before waste?
mediumA wall requires 12 pieces of 2x10 lumber at 16 feet each. Using nominal board feet, how many board feet are needed?
mediumA 32-foot by 18-foot roof plane will receive 4-foot by 8-foot sheathing panels. How many panels are needed before waste?
mediumA shear wall requires nails at 4 inches on center along panel edges. How many edge spaces are in 8 feet of panel edge?
mediumA 30-foot wall uses studs at 16 inches on center with a stud at each end. How many layout studs are needed before openings?
mediumA 20-foot beam requires bearing blocks at 4-foot spacing along a temporary support. How many spaces are there?
mediumA room is 18 feet by 16 feet and needs subfloor panels. Using 4-foot by 8-foot panels, how many panels are needed before waste?
mediumA shear wall edge is 96 inches long with nails at 6 inches on center. How many nail spaces are along that edge?
mediumA roof plane is 26 feet by 18 feet. How many square feet of roof sheathing are needed before waste?
mediumA deck is 12 feet by 16 feet. Decking costs $5.40 per square foot. What material cost is estimated before waste?
mediumA stair has total rise of 96 inches and will use 12 equal risers. What is each riser height?
mediumA 28-foot wall needs blocking at 4-foot intervals. How many intervals are there along the wall?
mediumA beam requires 14 pieces of 2x8 lumber at 12 feet. Using nominal board feet, how many board feet are needed?
mediumA 19-foot nonbearing partition is laid out at 16 inches on center with a stud at each end. How many layout studs are needed before openings?
mediumTemporary shoring posts are planned every 6 feet along a 42-foot beam line, including both ends. How many posts are needed?
mediumA shear wall line is 24 feet long, and hold-downs are required at 12-foot intervals including both ends. How many hold-down locations are needed?
mediumA roof plane is 31 feet by 17 feet. How many square feet of sheathing are needed before waste?
mediumA deck is 14 feet by 18 feet. How many square feet of framing area is being planned before waste?
mediumA stair has total rise of 105 inches and 15 equal risers. What is the riser height?
mediumA wall line has 9 anchor bolts already set. The revised plan adds 4 more anchor bolts. How many total bolts will be in the line?
mediumA wall section is 11 feet high and 18 feet long. What is its framed wall area?
mediumA beam line has hangers spaced every 24 inches along 16 feet. Including hangers at both ends, how many hanger locations are there?
mediumA 26-foot wall is framed at 16 inches on center with a stud at each end. How many layout studs are needed before openings?
mediumA temporary beam support uses posts every 5 feet over a 35-foot span, including both ends. How many posts are needed?
medium+ 250 more questions
Safety
240QA 24-foot extension ladder is set using a 4-to-1 ratio. How far should the base be from the wall?
mediumA 9-worker outdoor crew needs one quart of water per worker per hour for 6 hours. How many gallons are needed?
mediumA 100-foot work zone needs channelizing devices every 20 feet. How many devices are needed if one is placed at each end and every 20 feet between?
mediumTwelve bundles weigh 80 pounds each. What total load is being staged on the floor?
mediumA 14-worker crew works outdoors for 8 hours. At one quart per worker per hour, how many quarts of water are needed?
mediumA traffic-control taper uses a project rule of 10 feet of taper per 1 mph of speed. At 25 mph, what taper length is required?
mediumA crew lifts 18 panels weighing 45 pounds each onto a cart. What total weight is placed on the cart?
mediumA safety inspection found 9 hazards, and 7 were corrected by the next inspection. What percent were corrected?
mediumA ladder is 28 feet long and uses a 4-to-1 setup ratio. How far should the base be from the wall?
mediumA trench is 70 feet long, and the site rule requires access within 25 feet of workers. In a simple layout, how many access points are needed?
mediumA 10-worker crew needs one quart of water per worker per hour for 7 hours. How many gallons are needed?
mediumSixteen workers need water for a 5-hour outdoor task at one quart per worker per hour. How many quarts are needed?
mediumA project rule spaces cones every 15 feet along a 90-foot sidewalk detour. If cones are placed at both ends, how many cones are needed?
mediumTwenty panels weigh 38 pounds each. What total weight is being moved?
mediumA safety inspection finds 12 hazards, and 9 are corrected by Friday. What percent were corrected?
mediumTwelve outdoor workers need one quart of water per worker per hour for 6 hours. How many quarts are needed?
mediumA 32-foot ladder is set at a 4-to-1 ratio. How far should the base be from the wall?
mediumA pedestrian detour is 100 feet long with cones every 20 feet, including both ends. How many cones are needed?
mediumFifteen drywall sheets weigh 72 pounds each. What total weight is being moved?
mediumA deck platform is rated for 50 pounds per square foot and has 140 square feet. What total load rating does that represent?
mediumA crew corrects 18 of 24 inspection findings by the due date. What percent were corrected?
mediumA scaffold run needs 9 planks per bay for 4 bays. How many planks are needed?
mediumA trench ladder must be within 25 feet of workers. A 95-foot straight trench is laid out with access at both ends and intermediate points. What minimum number of access points is needed?
mediumA warning line must cover a 180-foot roof edge with stanchions every 30 feet, including both ends. How many stanchions are needed?
mediumThe outdoor crew has eighteen workers who each need one quart of water per hour for 4 hours. How many quarts should the site stage?
mediumA crew uses 14 respirator cartridges per day. How many cartridges are needed for 6 workdays?
mediumA warning line uses stanchions every 25 feet along a 150-foot roof edge, including both ends. How many stanchions are needed?
mediumA 36-foot ladder is set using a 4-to-1 ratio. How far should the base be from the wall?
mediumA scaffold has 6 bays, and each bay needs 8 planks. How many planks are needed?
mediumA trench is 120 feet long, and access points must be within 25 feet of workers. In a simple straight layout, what minimum number of access points is needed?
medium+ 210 more questions
Planning & Estimating
200QA basement slab pour covers a 25-foot by 18-foot rectangle at 4 inches thick. About how many cubic yards are needed before waste?
mediumIf the concrete takeoff is 5.56 cubic yards and the estimator adds 10 percent waste, what total order quantity results?
mediumA wall area takeoff totals 960 square feet. Using 4-foot by 8-foot drywall sheets, how many sheets are needed before waste?
mediumA paint scope has 1,200 square feet of wall area and requires two coats. If paint covers 350 square feet per gallon per coat, how many gallons should be planned before extra attic stock?
mediumA tile floor has 120 square feet of area and the estimator adds 15 percent waste. How many square feet should be ordered?
mediumA rectangular room is 15 feet by 12 feet and has one 3-foot door opening. How many linear feet of baseboard are needed before waste?
mediumA trench is 30 feet long, 2 feet wide, and 3 feet deep. How many cubic yards of excavation are there before swell?
mediumAn excavation has 6.67 bank cubic yards and the estimator uses 25 percent swell. What loose cubic yard quantity should be planned?
mediumA low-slope roof area is 2,400 square feet. How many roofing squares is that before waste?
mediumA 24-square roof estimate includes 12 percent waste. How many total squares should be planned?
mediumA crew of 4 workers works 7.5 hours each on demolition. At $68 per labor-hour burdened cost, what is the labor cost?
mediumA tile installer can place 85 square feet per day. How many full days are needed for 310 square feet?
mediumA 14-foot by 10-foot room needs underlayment at $2.25 per square foot. What is the material cost before waste?
mediumA rectangular footing is 60 feet long, 18 inches wide, and 12 inches deep. How many cubic yards of concrete are needed?
mediumA 40-foot run of wall requires blocking every 8 feet. How many blocking intervals are there along the run?
mediumA change adds 18 labor-hours at $74 per hour and $460 in material. What is the direct added cost before markup?
mediumA markup of 15 percent is applied to a $1,792 direct change cost. What total price results?
mediumA 22-foot by 16-foot room receives flooring priced at $6.40 per square foot with 8 percent waste. What material cost should be estimated?
mediumA crew productivity rate is 0.20 labor-hours per square foot for 750 square feet of work. How many labor-hours are required?
mediumA patio slab is 32 feet by 22 feet by 5 inches thick. About how many cubic yards of concrete are needed before waste?
mediumThe ready-mix order starts from a 10.87-cubic-yard concrete takeoff and adds 8 percent waste. What total order quantity results?
mediumA wallboard takeoff totals 1,152 square feet. Using 4-foot by 8-foot drywall sheets, how many sheets are needed before waste?
mediumThe paint estimate covers 1,540 square feet of wall area with two coats, and each gallon covers 385 square feet per coat. How many gallons should be planned before attic stock?
mediumThe tile order starts with 168 square feet of measured floor area and adds 12 percent waste. What square-foot quantity should be ordered?
mediumA rectangular room is 18 feet by 14 feet and has two 3-foot door openings. How many linear feet of baseboard are needed before waste?
mediumThe excavation takeoff lists a trench 42 feet long, 2.5 feet wide, and 4 feet deep. How many cubic yards are excavated before swell?
mediumThe haul-off worksheet starts with 15.56 bank cubic yards and applies 20 percent swell. What loose cubic yard quantity should be planned?
mediumA roof area is 3,150 square feet. How many roofing squares is that before waste?
mediumThe roofing material order starts from a 31.5-square estimate and adds 10 percent waste. How many total squares should be planned?
mediumThe demolition estimate assigns 5 workers for 6.5 hours each at a burdened rate of $72 per labor-hour. What labor cost should be carried?
medium+ 170 more questions
Other Exam Parts
Business & Financial Management
120Q · 6 content areas
Contract Administration
60Q · 4 content areas
Project Management
60Q · 3 content areas
NASCLA Commercial General Building Contractor
125Q · 12 content areas
California Law & Business
115Q · 7 content areas
California Contractor License Exam
150Q · 5 content areas
About California Class B Trade
115
Scored Questions
3.5h
Time Limit
1.8m
Per Question
The California Class B Trade exam is administered by PSI (CSLB). You must score at least 73% to pass this part. The exam is closed book — no reference materials are allowed, so every rule, number, and formula has to come from memory. Repetition-based practice is the fastest way to get there.
CSLB Class B (General Building) trade exam covering core trades, framing and structural work, finish trades, safety, and planning and estimating. Closed book.
What's Tested: 5 Content Areas
29%
Core Trades
Concrete, masonry, roofing, plumbing, electrical, and HVAC fundamentals for general building work.
~33 questions on the exam
20%
Finish Trades
Drywall, paint, flooring, tile, cabinetry, and other interior finish work.
~23 questions on the exam
20%
Framing & Structural
Wood framing, shear walls, seismic requirements, foundations, and structural connections.
~23 questions on the exam
17%
Safety
Fall protection, excavation and trenching, scaffolding, and Cal/OSHA jobsite rules.
~20 questions on the exam
14%
Planning & Estimating
Plan reading, take-offs, material quantities, scheduling, and job estimating.
~16 questions on the exam
Prioritize by Weight
Focus on Core Trades (29%) and Finish Trades (20%) first — they cover the most questions.
Drill From Memory
This exam is closed book — no lookups. Repeat practice sessions until the rules and numbers come to you automatically.
Master the Math
Calculation questions (payroll, overhead, bidding) are common. Practice with our math calculator until the formulas are second nature.
Know Your Statutes
State-specific laws and regulations are heavily tested. Bookmark these sections in your reference books for quick lookup.
Simulate Exam Conditions
Take timed 115-question practice sessions to build stamina for the 3.5-hour exam.
Review Wrong Answers
Use the wrong book feature to revisit missed questions. Understanding why an answer is wrong is as important as knowing the right answer.
Frequently Asked Questions
How many questions are on the California Class B Trade exam?
The California Class B Trade exam contains 115 scored questions. You must answer them within 3.5 hours. The exam is administered by PSI (CSLB) and is closed book — no reference materials are allowed, so the content has to be memorized.
What is the passing score for Class B Trade?
You need a score of 73% or higher to pass the California Class B Trade exam. That means you must answer at least 84 out of 115 questions correctly.
Is the Class B Trade exam open book?
No. The Class B Trade contractor exam is closed book. No reference materials are allowed in the testing room, so every rule, number, and formula has to come from memory.
How long do I have to complete the Class B Trade exam?
You have 3.5 hours (210 minutes) to complete all 115 questions. That averages to about 1.8 minutes per question.