A rectangular jobsite is 260 ft by 145 ft. The estimate includes a 20 ft gate opening and 3% extra fence. How many linear feet should be priced?
Correct Answer
C) 814 lf
Compute perimeter, subtract the gate opening, and add the extra fence allowance.
Why This Is the Correct Answer
Compute perimeter, subtract the gate opening, and add the extra fence allowance.
Why the Other Options Are Wrong
Option A: 790 lf
790 lf is below the supported result for temporary fencing; it likely omits part of the approved scope, cap, credit, or holdback.
Option B: 810 lf
810 lf is below the supported result for temporary fencing; it likely omits part of the approved scope, cap, credit, or holdback.
Option D: 836 lf
836 lf is above the supported result for temporary fencing; it likely adds scope or money the rule does not allow.
Memory Technique
Prepares Site-Control contract math: approved scope is the ruler for temporary fencing.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 11th Edition, 2024 to General conditions estimating; temporary fencing; confirm the required quantity, authority, timing, or record before selecting the answer.
More Contract Admin Questions
When must a signal person be provided during a crane lift under subpart CC?
How may a signal person’s qualification be established under subpart CC?
What does subpart CC require to be carried on crane equipment itself?
A competent person’s excavation inspection finds evidence of a possible cave-in. What does s. 1926.651(k)(2) require?
What does a "permit application" comprise where a private provider has done the plan review?
A tenant asks the general contractor to begin demolition inside an existing space before the permit is issued. What does s. 553.79(1)(a) provide?
The enforcing agency determines that permitted work is not in conformity with the Florida Building Code. What may it do under s. 553.79(1)(a)?
A permit is denied because the plans are found not to comply. What must the local enforcing agency give the applicant?
What must a request for a certificate of occupancy include on a private provider job?
A rejected payment application is corrected and resubmitted to a city whose charter requires the commission to approve payments. When must the city pay or reject it?