Why is joist bridging not simply cosmetic?
Correct Answer
D) It provides lateral stability to the joist system
Joist bridging is a stability component, not a finish item.
Why This Is the Correct Answer
Joist bridging is a stability component, not a finish item.
Why the Other Options Are Wrong
Option A: Use joist bridging function to be only a paint guide
Choice A (It is only a paint guide) is rejected because it tries to bypass the Joist bridging function checkpoint.
Option B: Use joist bridging function to replace anchor rods
In metals work, It replaces anchor rods is the wrong selection for Joist bridging function: it treats Joist bridging function as optional.
Option C: Use joist bridging function to waterproof the roof
The trap in C is It waterproofs the roof. That selection is wrong because the option shifts to a different trade task; the tested Joist bridging function function or field correction is It provides lateral stability to the joist system; Joist bridging contributes to lateral stability.
Memory Technique
Use joist bridging function as the label and It provides lateral stability to the joist system as the definition to recall under pressure.
Reference Hint
Open Steel Construction Manual, 15th Ed.; Steel Deck Institute and Steel Joist Institute standard practice; use the index entry or section for "Joist bridging concept" to confirm that Joist bridging is a stability component, not a finish item.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?