In the temporary facilities plan section, which labeled layer is immediately above TEMP PARTITION?
Correct Answer
D) PUBLIC ENTRY
The section stacks the layers vertically; PUBLIC ENTRY is printed immediately above TEMP PARTITION.
Why This Is the Correct Answer
The section stacks the layers vertically; PUBLIC ENTRY is printed immediately above TEMP PARTITION.
Why the Other Options Are Wrong
Option A: WORK ZONE
WORK ZONE is a different layer in the same section, but it is not the one directly above TEMP PARTITION.
Option B: EXIT ACCESS
EXIT ACCESS is an outside or terminal layer in the stack, not the adjacent layer asked for.
Option C: WORK ZONE
WORK ZONE is a different layer in the same section, but it is not the one directly above TEMP PARTITION.
Memory Technique
temporary facilities layer order cue on G-749: TEMP PARTITION anchors the one-band-up read.
Reference Hint
Open Sheet G-749; locate TEMP PARTITION in the section and read the layer immediately above it.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?