Nineteen steel deck sheets each cover 31 sq ft. What total coverage is available before waste?
Correct Answer
B) 589 sq ft
Total coverage is 19 x 31 sq ft = 589 sq ft.
Why This Is the Correct Answer
Total coverage is 19 x 31 sq ft = 589 sq ft.
Why the Other Options Are Wrong
Option A: 558 sq ft
steel deck coverage, choice a: 558 sq ft is off by 31 from the checked result 589 sq ft because it misuses the 31 item (steel deck sheets each cover 31 sq ft).
Option C: 620 sq ft
steel deck coverage, choice c: 620 sq ft is off by 31 from the checked result 589 sq ft because it misuses the 31 item (steel deck sheets each cover 31 sq ft).
Option D: 650 sq ft
steel deck coverage, choice d: 650 sq ft adds an extra unstated add-on/subtraction; the numeric gap is 61.
Memory Technique
Picture a panel space labeled steel deck coverage: finish every operation before accepting 589 sq ft.
Reference Hint
Open Steel Construction Manual, 15th Ed.; Steel Deck Institute and Steel Joist Institute standard practice; use the index entry or section for "Deck quantity calculation" to confirm that Total coverage is 19 x 31 sq ft = 589 sq ft.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass
Related Study Resources
Previous Question
The drywall lead verifies a control-joint layout: a cheaper product differs from the specified basis and has not been approved. What should happen before purchase?
Next Question
A fatal fall occurs on a construction site. Within what time must the employer report the fatality to OSHA?