A contract clause is applied to this fact pattern: what should a bidder do when the bid form requests acknowledgment of Addendum 4?
Correct Answer
A) Acknowledge Addendum 4 and include its scope
Acknowledge Addendum 4 and include its scope is the controlling requirement: the distractors are related-looking contract or field terms, but they do not match the cited requirement for review item 238.
Why This Is the Correct Answer
Acknowledge Addendum 4 and include its scope is the controlling requirement
Why the Other Options Are Wrong
Option B: The bidder should ignore it if no price changes
Choice B (Ignore it if no price changes) is rejected because the action skips the timing, documentation, or field-control step needed for Addendum acknowledgment.
Option C: Carry it as a post-award claim
In procurement and contracting, Carry it as a post-award claim is the wrong selection for Addendum acknowledgment: it leaves out the controlling Addendum acknowledgment result.
Option D: The bidder should use only the original drawings
The trap in D is Use only the original drawings. That selection is wrong because it leaves the work at an informal or incomplete stage, while Addendum acknowledgment requires.
Memory Technique
Make addendum acknowledgment a tabbed card: cite the exact condition, then choose Acknowledge Addendum 4 and include its scope.
Reference Hint
Open NASCLA Contractors Guide to Business, Law and Project Management, 14th Ed.; use the index entry or section for "Addenda acknowledgment" to confirm that Acknowledge Addendum 4 and include its scope is the controlling requirement
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass
Related Study Resources
Previous Question
Resilient flooring is scheduled over a new concrete slab, but moisture testing has not been completed. The flooring crew wants to install to meet the turnover date. What is the correct field decision?
Next Question
Anchor embeds are found out of tolerance before concrete placement. What is the best quality response?