A contract clause is applied to this fact pattern: which review asks whether the bidder has capacity, experience, resources, and integrity to perform?
Correct Answer
B) Responsible bidder review
Responsible bidder review is the controlling requirement: the distractors are related-looking contract or field terms, but they do not match the cited requirement for review item 202.
Why This Is the Correct Answer
Responsible bidder review is the controlling requirement
Why the Other Options Are Wrong
Option A: Base the responsible bidder response on responsive bid
In procurement and contracting, Responsive bid only is the wrong selection for Responsible bidder: the option delays or omits the controlling step.
Option C: Apply deductive alternate to the responsible bidder condition
Choice C gives Deductive alternate. Its specific error: the choice would not get the project to Responsible bidder review, which is the Responsible bidder result verified by the source. The accepted answer is Responsible bidder review.
Option D: Make final payment the answer for responsible bidder
Choice D (Final payment) is rejected because it names a financial document or payment mechanism, not the Responsible bidder action/result stated by Responsible bidder review. The cited answer is Responsible bidder review.
Memory Technique
File responsible bidder under a stormwater map: condition first, number or duty second, answer Responsible bidder review.
Reference Hint
Open NASCLA Contractors Guide to Business, Law and Project Management, 14th Ed.; use the index entry or section for "Bidder responsibility" to confirm that Responsible bidder review is the controlling requirement
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?