On the door plan, locate door D83; then use the door schedule. What rating is listed?
Correct Answer
A) Not rated
Sheet A-802 shows D83 on the plan excerpt; the matching schedule row lists Not rated in the Rating column.
Why This Is the Correct Answer
Sheet A-802 shows D83 on the plan excerpt; the matching schedule row lists None in the Rating column.
Why the Other Options Are Wrong
Option B: 45 min
45 min is the rating entry for D81, not for the mark located on the plan.
Option C: 90 min
90 min is the rating entry for D82, not for the mark located on the plan.
Option D: 20 min
20 min is the rating entry for D84, not for the mark located on the plan.
Memory Technique
For door and 03, the graphic tag is the row lock and Rating is the column lock.
Reference Hint
Open Sheet A-802; locate D83 in the plan excerpt before reading the schedule row.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management