On the floor plan, what wall type tag is shown for room R501?
Correct Answer
D) GLZ
Room R501 carries the wall type tag GLZ on Sheet G-115.
Why This Is the Correct Answer
Room R501 carries the wall type tag GLZ on Sheet G-115.
Why the Other Options Are Wrong
Option A: 1HR
Choice A is a different room label or wall tag visible on the floor plan.
Option B: MTL
Choice B is a different room label or wall tag visible on the floor plan.
Option C: GYP
Choice C is a different room label or wall tag visible on the floor plan.
Memory Technique
In general floor - wall types, R501 is the pin; the wall type must come from the same enclosed space.
Reference Hint
Open Sheet G-115; locate R501, then read the adjacent room label, wall tag, or door relationship.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass
Related Study Resources
Previous Question
Stored ceiling tile pallets are placed directly in front of a switchgear lineup on the day of startup. What should the superintendent require before energization work proceeds?
Next Question
A long CMU corridor wall has no control joints shown near a re-entrant corner, and shrinkage cracking is likely to concentrate there. What is the best preconstruction action?