The Hialeah crew finds this floor-opening condition: floor opening is covered with loose plywood. Which safety action is required before traffic continues?
Correct Answer
B) secure the cover
Hole covers must be secured and identified so employees are protected from falling through openings.
Why This Is the Correct Answer
Hole covers must be secured and identified so employees are protected from falling through openings.
Why the Other Options Are Wrong
Option A: paint it to be visible
paint it to be visible may relate to another site control, but it does not remove or guard the hole cover control exposure being tested.
Option C: workers step around it
workers step around it may relate to another site control, but it does not remove or guard the hole cover control exposure being tested.
Option D: add a loose sheet on top
add a loose sheet on top may relate to another site control, but it does not remove or guard the hole cover control exposure being tested.
Memory Technique
Hole Cover lock for Superintendent Controls: covers is the harm, secured is the guard.
Reference Hint
Open-book path: tab OSHA 29 CFR 1926 to Subpart M, 1926.502(i) Covers; verify the OSHA safety threshold or jobsite control before answering.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
While preparing the subcontractor quantity check for the maintenance-shop wash bay, the one-sided curb line requires 336 LF of curb forms at 2.5 ft high on 1 side. What contact area is required?
Next Question
For the subcontractor quantity check at the police evidence-processing room, the patio paving area for paver units is 1785 SF, with 12% attic stock and waste. A carton covers 18 SF. How many cartons should be ordered?