From the loading strip dimension plan, what perimeter length is needed for edge restraint?
Correct Answer
B) 152 ft
The perimeter is 152 linear feet.
Why This Is the Correct Answer
The perimeter is 152 linear feet.
Why the Other Options Are Wrong
Option A: 128 ft
128 ft is below the supported result for site dimension perimeter; it likely omits allowance, conversion, coverage, or final round-up.
Option C: 144 ft
144 ft is below the supported result for site dimension perimeter; it likely omits allowance, conversion, coverage, or final round-up.
Option D: 168 ft
168 ft is above the supported result for site dimension perimeter; it likely double-counts allowance, uses the wrong unit, or rounds too early.
Memory Technique
Measure to linear, adjust for feet, then let Checks Edge set the finish line.
Reference Hint
Open-book path: turn to sheet C-202 in the plan packet, then use the SITE DIMENSION PLAN - LOADING STRIP note/table before checking P&P Commercial Construction plan-reading guidance.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
For the crew-release check at the college lab corridor, the parapet return face measures 3590 SF before a 5% waste allowance. Each sheathing sheet covers 40 SF. How many sheets should be ordered?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
For the subcontractor quantity check at the urgent-care ambulance canopy, the concrete washout solids produces 42 CY of solid waste volume, with 15% swell or handling allowance. Each container holds 10 CY. How many containers are required?
Next Question
During the buyout verification pass at the plant-nursery sales canopy, a trench drain has a 132 ft run at 0.50% slope. What fall across the run is required in inches?