From the specialty item schedule, what height is listed for SP-3?
Correct Answer
B) 78 in
SP-3 lists 78 in.
Why This Is the Correct Answer
SP-3 lists 78 in.
Why the Other Options Are Wrong
Option A: 72 in
72 in skips the written authority, scope, price, notice, or release control needed for specialty schedule lookup.
Option C: 84 in
84 in skips the written authority, scope, price, notice, or release control needed for specialty schedule lookup.
Option D: 60 in
60 in skips the written authority, scope, price, notice, or release control needed for specialty schedule lookup.
Memory Technique
Checks Server-Rack shortcut is not a term until paper carries it.
Reference Hint
Open-book path: turn to sheet A-802 in the plan packet, then use the SPECIALTY ITEM SCHEDULE note/table before checking P&P Commercial Construction plan-reading guidance.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
For the crew-release check at the college lab corridor, the parapet return face measures 3590 SF before a 5% waste allowance. Each sheathing sheet covers 40 SF. How many sheets should be ordered?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
During the crew-release check at the cafeteria dishwashing alcove, the muck haul-off includes 71 CY of excavated spoil. Each delivery truck carries 14 CY. How many truckloads are required?
Next Question
The work plan must account for this condition: frame must remain stable during erection. Which steel erection control is most suitable?
