The work plan must account for this condition: frame must remain stable during erection. Which steel erection control is most suitable?
Correct Answer
A) temporary bracing until frame stability
temporary bracing until frame stability best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
temporary bracing until frame stability best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option B: remove bracing after first beam
remove bracing after first beam puts the item in the wrong financial bucket, timing, base, or comparison for steel erection sequence.
Option C: load deck before frame is plumbed
load deck before frame is plumbed puts the item in the wrong financial bucket, timing, base, or comparison for steel erection sequence.
Option D: release crane before stability is achieved
release crane before stability is achieved puts the item in the wrong financial bucket, timing, base, or comparison for steel erection sequence.
Memory Technique
An unlabeled Manager Checking dollar tells the wrong story.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Structural steel methods; erection sequence and temporary stability; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass