A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
Correct Answer
B) Coordinate separation geotextile between soils
separation geotextile between soils best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
separation geotextile between soils best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option A: Coordinate impermeable liner under drain stone
Coordinate impermeable liner under drain stone addresses a neighboring field issue, but not the condition or method control required for geotextile function.
Option C: Coordinate erosion blanket used as separator
Coordinate erosion blanket used as separator addresses a neighboring field issue, but not the condition or method control required for geotextile function.
Option D: Coordinate filter fabric placed where drainage must be blocked
Coordinate filter fabric placed where drainage must be blocked addresses a neighboring field issue, but not the condition or method control required for geotextile function.
Memory Technique
Geotextile Function method for Manager Checking: condition first, tool second.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Earthwork materials; separation filtration and stabilization; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
For the crew-release check at the college lab corridor, the parapet return face measures 3590 SF before a 5% waste allowance. Each sheathing sheet covers 40 SF. How many sheets should be ordered?
People Also Study