For the subcontractor quantity check at the police evidence-processing room, the patio paving area for paver units is 1785 SF, with 12% attic stock and waste. A carton covers 18 SF. How many cartons should be ordered?
Correct Answer
C) 112 cartons
Carton quantity equals adjusted floor or ceiling area divided by carton coverage, rounded up.
Why This Is the Correct Answer
Carton quantity equals adjusted floor or ceiling area divided by carton coverage, rounded up.
Why the Other Options Are Wrong
Option A: 99 cartons
99 cartons is below the supported result for paver units; it likely omits allowance, conversion, coverage, or final round-up.
Option B: 116 cartons
116 cartons is above the supported result for paver units; it likely double-counts allowance, uses the wrong unit, or rounds too early.
Option D: 110 cartons
110 cartons is below the supported result for paver units; it likely omits allowance, conversion, coverage, or final round-up.
Memory Technique
Measure to carton, adjust for adjusted, then let Finishes Estimator set the finish line.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Unit paving; carton coverage and waste; verify the construction method, material quantity, equipment use, unit conversion, or field-control calculation.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
The Hialeah crew finds this floor-opening condition: floor opening is covered with loose plywood. Which safety action is required before traffic continues?
Next Question
For the subcontractor quantity check at the bank drive-through canopy, the #6 grade-beam bars takeoff has 87 bars at 24 ft each. Using 1.502 lb per ft for beam reinforcement, what reinforcing weight is estimated?