A St. Augustine worker finds an extension cord with this defect: cord is repaired with tape only. Which action is safest before use continues?
Correct Answer
D) tag out damaged cord
Damaged electrical cords must be removed from service or repaired properly before use.
Why This Is the Correct Answer
Damaged electrical cords must be removed from service or repaired properly before use.
Why the Other Options Are Wrong
Option A: add more tape on the splice
add more tape on the splice may relate to another site control, but it does not remove or guard the damaged cord control exposure being tested.
Option B: use until the splice fails
use until the splice fails may relate to another site control, but it does not remove or guard the damaged cord control exposure being tested.
Option C: keep if the tape is outdoor-rated
keep if the tape is outdoor-rated may relate to another site control, but it does not remove or guard the damaged cord control exposure being tested.
Memory Technique
Name the harm before the guard; add, more, tape cannot stand in for Foreman Controls.
Reference Hint
Open-book path: tab OSHA 29 CFR 1926 to Subpart K, 1926.403 and 1926.405 Electrical safety requirements; verify the OSHA safety threshold or jobsite control before answering.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
In the look-ahead meeting, the constraint is that long-lead item needs early coordinated release. Which procurement sequence should the project team carry?
Next Question
The work plan must account for this condition: the controlling field constraint is that CMU units need accurate cuts. Which masonry tool is most suitable?