The work plan must account for this condition: the controlling field constraint is that CMU units need accurate cuts. Which masonry tool is most suitable?
Correct Answer
D) Select masonry saw with proper blade
masonry saw with proper blade best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
masonry saw with proper blade best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option A: Select block splitter for rough CMU cuts
Select block splitter for rough CMU cuts puts the item in the wrong financial bucket, timing, base, or comparison for masonry saw cutting.
Option B: Select abrasive cut-off saw for masonry units
Select abrasive cut-off saw for masonry units puts the item in the wrong financial bucket, timing, base, or comparison for masonry saw cutting.
Option C: Select wet saw for precise masonry cuts
Select wet saw for precise masonry cuts puts the item in the wrong financial bucket, timing, base, or comparison for masonry saw cutting.
Memory Technique
An unlabeled Foreman Selecting dollar tells the wrong story.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Masonry tools; cutting units and fit-up; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
A St. Augustine worker finds an extension cord with this defect: cord is repaired with tape only. Which action is safest before use continues?
Next Question
For the upcoming operation, the key field fact is that the project condition shows that work is directly overhead on a flat slab. Which access equipment should govern the choice?