For the upcoming operation, the key field fact is that the project condition shows that work is directly overhead on a flat slab. Which access equipment should govern the choice?
Correct Answer
B) Use scissor lift
scissor lift best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
scissor lift best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option A: Use articulating boom lift
Use articulating boom lift puts the item in the wrong financial bucket, timing, base, or comparison for scissor lift access.
Option C: Use mast-climbing work platform
Use mast-climbing work platform puts the item in the wrong financial bucket, timing, base, or comparison for scissor lift access.
Option D: Use mobile scaffold tower
Use mobile scaffold tower puts the item in the wrong financial bucket, timing, base, or comparison for scissor lift access.
Memory Technique
Controlling and condition point to different ledger roads for Manager Checking.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Tools and equipment; aerial lift selection by access need; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
The work plan must account for this condition: the controlling field constraint is that CMU units need accurate cuts. Which masonry tool is most suitable?
Next Question
While preparing the next-week procurement cycle for the radiology equipment platform, the mobilization payment shows a $48,500 pay application amount. If 10% is withheld, what retainage withheld should be shown?