During the look-ahead planning meeting at the storm-shelter entry vestibule, the open ceiling area for dryfall ceiling paint is 3400 SF and requires 1 coat. At 325 SF per gallon, how many gallons are required?
Correct Answer
B) 11 gallons
Gallons equal area times coats divided by coverage, rounded up.
Why This Is the Correct Answer
Gallons equal area times coats divided by coverage, rounded up.
Why the Other Options Are Wrong
Option A: 10 gallons
10 gallons is below the supported result for dryfall ceiling paint; it likely omits allowance, conversion, coverage, or final round-up.
Option C: 9 gallons
9 gallons is below the supported result for dryfall ceiling paint; it likely omits allowance, conversion, coverage, or final round-up.
Option D: 14 gallons
14 gallons is above the supported result for dryfall ceiling paint; it likely double-counts allowance, uses the wrong unit, or rounds too early.
Memory Technique
Dryfall cart for Finishes Superintendent: controlling first, area second, whole the controlling choice last.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Painting; exposed ceiling coverage; verify the construction method, material quantity, equipment use, unit conversion, or field-control calculation.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
The Tallahassee project has this cutting/welding condition: combustibles cannot be moved from the area. Which fire-prevention control should be documented?
Next Question
The foreman is preparing the next work area, and the controlling field constraint is that hardware prep depends on templates. Which door hardware method should be used?