The Tallahassee project has this cutting/welding condition: combustibles cannot be moved from the area. Which fire-prevention control should be documented?
Correct Answer
B) protect combustibles
Hot work requires controlling combustibles and maintaining fire-watch/fire-prevention measures as conditions require.
Why This Is the Correct Answer
Hot work requires controlling combustibles and maintaining fire-watch/fire-prevention measures as conditions require.
Why the Other Options Are Wrong
Option A: weld faster to limit sparks
weld faster to limit sparks may relate to another site control, but it does not remove or guard the hot-work fire prevention exposure being tested.
Option C: wet only the floor below
wet only the floor below may relate to another site control, but it does not remove or guard the hot-work fire prevention exposure being tested.
Option D: add lighting to spot fire
add lighting to spot fire may relate to another site control, but it does not remove or guard the hot-work fire prevention exposure being tested.
Memory Technique
Name the harm before the guard; weld, faster, limit cannot stand in for Superintendent Controls.
Reference Hint
Open-book path: tab OSHA 29 CFR 1926 to Subpart J, 1926.352 Fire prevention and welding/cutting; verify the OSHA safety threshold or jobsite control before answering.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
While preparing the next-week procurement cycle for the radiology equipment platform, the mobilization payment shows a $48,500 pay application amount. If 10% is withheld, what retainage withheld should be shown?
Next Question
During the look-ahead planning meeting at the storm-shelter entry vestibule, the open ceiling area for dryfall ceiling paint is 3400 SF and requires 1 coat. At 325 SF per gallon, how many gallons are required?