During the field-takeoff reconciliation at the school media-center infill, the slope-adjusted area for the metal roof panel order totals 17440 SF. With 12% waste, how many roofing squares are needed?
Correct Answer
B) 195.3 squares
Roofing squares equal roof square feet with waste divided by 100.
Why This Is the Correct Answer
Roofing squares equal roof square feet with waste divided by 100.
Why the Other Options Are Wrong
Option A: 174.4 squares
174.4 squares is below the supported result for metal roof panel order; it likely omits allowance, conversion, coverage, or final round-up.
Option C: 2,170.3 squares
2,170.3 squares is above the supported result for metal roof panel order; it likely double-counts allowance, uses the wrong unit, or rounds too early.
Option D: 203.3 squares
203.3 squares is above the supported result for metal roof panel order; it likely double-counts allowance, uses the wrong unit, or rounds too early.
Memory Technique
Measure to roofing, adjust for controlling, then let Roofing Estimator set the finish line.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Metal roofing; square conversion; verify the construction method, material quantity, equipment use, unit conversion, or field-control calculation.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?