During the look-ahead planning meeting at the visitor-center exhibit wall, the stair return run requires 443 LF of handrail tube stock plus 4% waste. Stock comes in 20 ft lengths. How many lengths are required?
Correct Answer
B) 24 lengths
Linear stock count equals required length with waste divided by stock length, rounded up.
Why This Is the Correct Answer
Linear stock count equals required length with waste divided by stock length, rounded up.
Why the Other Options Are Wrong
Option A: 22 lengths
22 lengths is below the supported result for handrail tube stock; it likely omits allowance, conversion, coverage, or final round-up.
Option C: 23 lengths
23 lengths is below the supported result for handrail tube stock; it likely omits allowance, conversion, coverage, or final round-up.
Option D: 25 lengths
25 lengths is above the supported result for handrail tube stock; it likely double-counts allowance, uses the wrong unit, or rounds too early.
Memory Technique
Handrail cart for Field Engineer: linear first, stock second, whole units last.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Metals; handrail stock length estimating; verify the construction method, material quantity, equipment use, unit conversion, or field-control calculation.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
On this project, the controlling condition is the project condition shows that the specification requires a mockup. Which quality-control step should be selected?
Next Question
During the field-takeoff reconciliation at the stormwater-lift-station yard, the finished floor area for temporary floor protection is 9000 SF. With 12% waste and 40 SF per sheet or panel, how many sheets are required?