On this project, the controlling condition is the project condition shows that the specification requires a mockup. Which quality-control step should be selected?
Correct Answer
B) Use approved mockup before production
approved mockup before production best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
approved mockup before production best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option A: Use first completed elevation approval
Use first completed elevation approval skips the written authority, scope, price, notice, or release control needed for mockup sequence.
Option C: Use catalog submittal only
Use catalog submittal only skips the written authority, scope, price, notice, or release control needed for mockup sequence.
Option D: Use final punch-list comparison
Use final punch-list comparison skips the written authority, scope, price, notice, or release control needed for mockup sequence.
Memory Technique
Mockup Sequence square for Manager Checking: scope, authority, price, paper.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Construction methods; mockups and quality-control sequence; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
While preparing the preconstruction estimate lock for the transit-platform kiosk, the floor area for carpet tile field is 14715 SF and the order includes 0% waste. How many square yards are required?
Next Question
During the look-ahead planning meeting at the visitor-center exhibit wall, the stair return run requires 443 LF of handrail tube stock plus 4% waste. Stock comes in 20 ft lengths. How many lengths are required?