During the pre-installation review, the field issue is that the work should be released only if the team addresses that deep formed concrete must be consolidated inside the form. Which concrete tool is the best match?
Correct Answer
D) Coordinate internal concrete vibrator
internal concrete vibrator best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
internal concrete vibrator best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option A: Coordinate vibrating screed
Coordinate vibrating screed addresses a neighboring field issue, but not the condition or method control required for concrete tool selection.
Option B: Coordinate power trowel
Coordinate power trowel addresses a neighboring field issue, but not the condition or method control required for concrete tool selection.
Option C: Equipment choice: Coordinate external form vibrator
Equipment choice: Coordinate external form vibrator addresses a neighboring field issue, but not the condition or method control required for concrete tool selection.
Memory Technique
Concrete Tool Selection method for Manager Checking: condition first, tool second.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Concrete tools; internal vibrators for consolidation; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
For the upcoming operation, the key field fact is that the project condition shows that water must be directed to drain. Which roof slope material should govern the choice?
Next Question
During the field-takeoff reconciliation at the laboratory exhaust chase, a isolated mat footing is 60 ft by 26 ft by 4 in. Including 7% waste, how many cubic yards of concrete are needed?