During the field-takeoff reconciliation at the laboratory exhaust chase, a isolated mat footing is 60 ft by 26 ft by 4 in. Including 7% waste, how many cubic yards of concrete are needed?
Correct Answer
B) 20.6 CY
Convert slab thickness from inches to feet, divide by 27 cubic feet per cubic yard, then add waste.
Why This Is the Correct Answer
Convert slab thickness from inches to feet, divide by 27 cubic feet per cubic yard, then add waste.
Why the Other Options Are Wrong
Option A: 19.3 CY
19.3 CY is below the supported result for canopy column mat; it likely omits allowance, conversion, coverage, or final round-up.
Option C: 231.1 CY
231.1 CY is above the supported result for canopy column mat; it likely double-counts allowance, uses the wrong unit, or rounds too early.
Option D: 23.1 CY
23.1 CY is above the supported result for canopy column mat; it likely double-counts allowance, uses the wrong unit, or rounds too early.
Memory Technique
Canopy Column Mat cart for Superintendent Validates: convert first, slab second, whole cy last.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Concrete foundations; mat footing quantity; verify the construction method, material quantity, equipment use, unit conversion, or field-control calculation.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
During the pre-installation review, the field issue is that the work should be released only if the team addresses that deep formed concrete must be consolidated inside the form. Which concrete tool is the best match?
Next Question
The Deerfield Beach project has this stairway condition: temporary stairs lack handrail protection. Which safety control applies?