Before the inspection hold point, the team confirms that the project condition shows that reinforcement position and grout space must be maintained. Which masonry reinforcement method is appropriate?
Correct Answer
B) Use centered vertical bars with clean cells
centered vertical bars with clean cells best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
centered vertical bars with clean cells best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option A: Use bars touching shell face
Use bars touching shell face addresses a neighboring field issue, but not the condition or method control required for cmu reinforcement placement.
Option C: Use mortar droppings left in grout space
Use mortar droppings left in grout space addresses a neighboring field issue, but not the condition or method control required for cmu reinforcement placement.
Option D: Use grout placed before reinforcement inspection
Use grout placed before reinforcement inspection addresses a neighboring field issue, but not the condition or method control required for cmu reinforcement placement.
Memory Technique
The field condition asks; cmu reinforcement answers in work boots for Manager Checking.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Masonry methods; reinforced CMU cell preparation; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
