From the roof terrace plan, which sheet should you open for detail 14?

Correct Answer

D) A-734

Detail bubble 14 over A-734 references the terrace drain edge.

Answer Options
A
A-731
B
A-732
C
A-733
D
A-734

Why This Is the Correct Answer

Detail bubble 14 over A-734 references the terrace drain edge.

Why the Other Options Are Wrong

Option A: A-731

A-731 may relate to another site control, but it does not remove or guard the callout sheet reference exposure being tested.

Option B: A-732

A-732 may relate to another site control, but it does not remove or guard the callout sheet reference exposure being tested.

Option C: A-733

A-733 may relate to another site control, but it does not remove or guard the callout sheet reference exposure being tested.

Memory Technique

Callout Sheet Reference lock for Roof Terrace: detail is the harm, bubble is the guard.

Reference Hint

Open-book path: turn to sheet A-204 in the plan packet, then use the PARTIAL PLAN - TERRACE DRAIN EDGE note/table before checking P&P Commercial Construction plan-reading guidance.

Was this explanation helpful?

More Project Mgmt Questions

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your contractor license exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.