The West Palm Beach crane pick has this communication condition: lift path is blocked from operator view. Which safety control should be used?
Correct Answer
C) single designated signaler
Crane operations need clear, qualified signaling when the operator's view or communication is limited.
Why This Is the Correct Answer
Crane operations need clear, qualified signaling when the operator's view or communication is limited.
Why the Other Options Are Wrong
Option A: several workers signal at once
several workers signal at once may relate to another site control, but it does not remove or guard the crane signal control exposure being tested.
Option B: rigger and foreman both direct
rigger and foreman both direct may relate to another site control, but it does not remove or guard the crane signal control exposure being tested.
Option D: hand and radio from two people
hand and radio from two people may relate to another site control, but it does not remove or guard the crane signal control exposure being tested.
Memory Technique
If Lift Director can still reach the worker, the control is decoration.
Reference Hint
Open-book path: tab OSHA 29 CFR 1926 to Subpart CC, 1926.1419 Signals and 1926.1428 Signal person qualifications; verify the OSHA safety threshold or jobsite control before answering.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
In the look-ahead meeting, the constraint is that the controlling field constraint is that cleaning must match units and mortar. Which masonry cleaning method should the project team carry?
Next Question
Before the inspection hold point, the team confirms that the project condition shows that reinforcement position and grout space must be maintained. Which masonry reinforcement method is appropriate?