Before the inspection hold point, the team confirms that the project condition shows that granular backfill is in a narrow trench. Which compaction equipment is appropriate?
Correct Answer
B) Use trench rammer or vibratory plate
trench rammer or vibratory plate best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
trench rammer or vibratory plate best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option A: Equipment choice: Use large smooth-drum roller
Equipment choice: Use large smooth-drum roller may relate to another site control, but it does not remove or guard the confined backfill compaction exposure being tested.
Option C: Use padfoot roller
Use padfoot roller may relate to another site control, but it does not remove or guard the confined backfill compaction exposure being tested.
Option D: Use pneumatic-tired roller
Use pneumatic-tired roller may relate to another site control, but it does not remove or guard the confined backfill compaction exposure being tested.
Memory Technique
Name the harm before the guard; equipment, large, smooth-drum cannot stand in for Manager Checking.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Earthwork tools; confined-area backfill compaction; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
The construction team is coordinating a method decision because sheathing must resist loads per pattern. Which sheathing method is best?
Next Question
For the look-ahead planning meeting at the storm-shelter entry vestibule, the #3 stirrup stock takeoff has 60 bars at 30 ft each. Using 0.376 lb per ft for stirrup fabrication, what reinforcing weight is estimated?