The construction team is coordinating a method decision because sheathing must resist loads per pattern. Which sheathing method is best?
Correct Answer
D) fasten sheathing per pattern and edge spacing
fasten sheathing per pattern and edge spacing best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
fasten sheathing per pattern and edge spacing best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option A: Field method: random fastening until board feels tight
Field method: random fastening until board feels tight may relate to another site control, but it does not remove or guard the exterior sheathing fastening exposure being tested.
Option B: leave unsupported vertical joints
leave unsupported vertical joints may relate to another site control, but it does not remove or guard the exterior sheathing fastening exposure being tested.
Option C: use interior drywall screws outside
use interior drywall screws outside may relate to another site control, but it does not remove or guard the exterior sheathing fastening exposure being tested.
Memory Technique
If Foreman Selecting can still reach the worker, the control is decoration.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Exterior wall methods; sheathing fastening and layout; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
While preparing the buyout verification pass for the warehouse fire-pump room, 146 locations are included in the casework blocking. At 0.5 labor hours per location, how many labor hours are budgeted?
Next Question
Before the inspection hold point, the team confirms that the project condition shows that granular backfill is in a narrow trench. Which compaction equipment is appropriate?