A Florida superintendent must choose the proper grout material because base plate needs load-bearing grout. Which option is best?
Correct Answer
A) nonshrink grout under base plate
nonshrink grout under base plate best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
nonshrink grout under base plate best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option B: dry sand packed under plate
dry sand packed under plate addresses a neighboring field issue, but not the condition or method control required for nonshrink grout use.
Option C: Material choice: thinset mortar under steel base
Material choice: thinset mortar under steel base addresses a neighboring field issue, but not the condition or method control required for nonshrink grout use.
Option D: sealant bead around plate edge
sealant bead around plate edge addresses a neighboring field issue, but not the condition or method control required for nonshrink grout use.
Memory Technique
the controlling choice Use method for Manager Checking: condition first, tool second.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Grouting materials; base plates and equipment setting; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass