On this project, the controlling condition is the project condition shows that CMU units need accurate cuts. Which masonry tool should be selected?
Correct Answer
B) Use masonry saw with proper blade
masonry saw with proper blade best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
masonry saw with proper blade best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the area summary schedule, what occupancy is listed for Zone D?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
During the look-ahead planning meeting at the restaurant grease-interceptor area, the office flooring area for carpet tile is 10290 SF, with 5% attic stock and waste. A carton covers 48 SF. How many cartons should be ordered?
Next Question
A Florida superintendent must choose the proper grout material because base plate needs load-bearing grout. Which option is best?