The construction team is coordinating a method decision because bonded pad needs surface preparation. Which equipment pad method is best?
Correct Answer
D) roughen and clean slab before bonded pad
roughen and clean slab before bonded pad best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
roughen and clean slab before bonded pad best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option A: cast pad over dust and curing residue
cast pad over dust and curing residue addresses a neighboring field issue, but not the condition or method control required for housekeeping pad prep.
Option B: set anchor bolts after equipment is placed
set anchor bolts after equipment is placed addresses a neighboring field issue, but not the condition or method control required for housekeeping pad prep.
Option C: use sealant as pad leveling compound
use sealant as pad leveling compound addresses a neighboring field issue, but not the condition or method control required for housekeeping pad prep.
Memory Technique
Housekeeping Pad Prep method for Foreman Selecting: condition first, tool second.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Concrete methods; equipment housekeeping pads; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
Before releasing the work, the team identifies this condition: the controlling field constraint is that joint must resist water passage through concrete. Which waterstop material fits best?
Next Question
While preparing the subcontractor quantity check for the maintenance-shop wash bay, the one-sided curb line requires 336 LF of curb forms at 2.5 ft high on 1 side. What contact area is required?