The construction team is coordinating a method decision because stud cavities will be concealed by gypsum board. Which coordination item is best?
Correct Answer
B) required in-wall rough-in and inspections
required in-wall rough-in and inspections best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
required in-wall rough-in and inspections best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option A: Field method: above-ceiling inspection only
Field method: above-ceiling inspection only addresses a neighboring field issue, but not the condition or method control required for wall close-in sequence.
Option C: final paint inspection
final paint inspection addresses a neighboring field issue, but not the condition or method control required for wall close-in sequence.
Option D: baseboard layout review
baseboard layout review addresses a neighboring field issue, but not the condition or method control required for wall close-in sequence.
Memory Technique
Controlling is the clue; condition is the method check for Foreman Selecting Tie the cue to Wall Close-In Sequence Foreman.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Interior construction methods; rough-in coordination before wall close-in; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
The Tampa crane pick has this communication condition: multiple spotters are giving conflicting directions. Which safety control should be used?
Next Question
Before the inspection hold point, the team confirms that the project condition shows that equipment base needs coordinated pad and anchors. Which equipment pad method is appropriate?