Before the inspection hold point, the team confirms that the project condition shows that equipment base needs coordinated pad and anchors. Which equipment pad method is appropriate?
Correct Answer
B) Use formed pad with anchors coordinated to equipment
formed pad with anchors coordinated to equipment best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
formed pad with anchors coordinated to equipment best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option A: Field method: Use unanchored pad poured after startup
Field method: Use unanchored pad poured after startup addresses a neighboring field issue, but not the condition or method control required for equipment housekeeping pad.
Option C: Use dry-pack shims only under equipment
Use dry-pack shims only under equipment addresses a neighboring field issue, but not the condition or method control required for equipment housekeeping pad.
Option D: Use sealant bead used as leveler
Use sealant bead used as leveler addresses a neighboring field issue, but not the condition or method control required for equipment housekeeping pad.
Memory Technique
Concrete is the clue; methods is the method check for Manager Checking.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Concrete methods; housekeeping pads and anchorage; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
The construction team is coordinating a method decision because stud cavities will be concealed by gypsum board. Which coordination item is best?
Next Question
The work plan must account for this condition: the controlling field constraint is that deep formed concrete must be consolidated inside the form. Which concrete tool is most suitable?