A trade plans hot work in an occupied renovation area. What should the GC coordinate operationally?
Correct Answer
C) Required hot-work controls, fire watch, permits, and occupant protection before work starts
Field operations require safety and protection controls for hazardous work activities.
Why This Is the Correct Answer
Field operations require safety and protection controls for hazardous work activities.
Why the Other Options Are Wrong
Option A: Let the welder proceed if the crew can finish before lunch
Let the welder proceed if the crew can finish before lunch may relate to another site control, but it does not remove or guard the hot work coordination exposure being tested.
Option B: Use the final cleaning checklist as the fire-watch record
Use the final cleaning checklist as the fire-watch record may relate to another site control, but it does not remove or guard the hot work coordination exposure being tested.
Option D: Treat the owner's verbal awareness as a substitute for hot-work controls and fire-watch records
Treat the owner's verbal awareness as a substitute for hot-work controls and fire-watch records may relate to another site control, but it does not remove or guard the hot work coordination exposure being tested.
Memory Technique
If Coordinates Welding can still reach the worker, the control is decoration.
Reference Hint
Open-book path: tab OSHA 29 CFR 1926; Contractor's Manual to Hot work planning and jobsite safety controls; match the role, timing, and required approval before choosing.
More Contract Admin Questions
When must a signal person be provided during a crane lift under subpart CC?
How may a signal person’s qualification be established under subpart CC?
What does subpart CC require to be carried on crane equipment itself?
A competent person’s excavation inspection finds evidence of a possible cave-in. What does s. 1926.651(k)(2) require?
What does a "permit application" comprise where a private provider has done the plan review?
A tenant asks the general contractor to begin demolition inside an existing space before the permit is issued. What does s. 553.79(1)(a) provide?
The enforcing agency determines that permitted work is not in conformity with the Florida Building Code. What may it do under s. 553.79(1)(a)?
A permit is denied because the plans are found not to comply. What must the local enforcing agency give the applicant?
What must a request for a certificate of occupancy include on a private provider job?
A rejected payment application is corrected and resubmitted to a city whose charter requires the commission to approve payments. When must the city pay or reject it?
People Also Study
Business & Financial Management
120 questions · 70% to pass
Project Management
60 questions · 70% to pass