A Florida bid drawing shows 18,500 sf of low-slope roof membrane. The estimator carries 9% waste for laps and cuts. How many square feet should be included?
Correct Answer
A) 20,165 sf
Waste is applied to the measured membrane area.
Why This Is the Correct Answer
Waste is applied to the measured membrane area.
Why the Other Options Are Wrong
Option B: 18,500 sf
18,500 sf is below the supported result for roof membrane takeoff; it likely omits allowance, conversion, coverage, or final round-up.
Option C: 19,665 sf
19,665 sf is below the supported result for roof membrane takeoff; it likely omits allowance, conversion, coverage, or final round-up.
Option D: 21,350 sf
21,350 sf is above the supported result for roof membrane takeoff; it likely double-counts allowance, uses the wrong unit, or rounds too early.
Memory Technique
Roof Membrane Takeoff cart for Pricing Low-Slope: waste first, applied second, whole sf last.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 11th Edition, 2024 to Estimating and quantity takeoff; roofing membrane waste factor; match the project role and timing before choosing.
More Contract Admin Questions
When must a signal person be provided during a crane lift under subpart CC?
How may a signal person’s qualification be established under subpart CC?
What does subpart CC require to be carried on crane equipment itself?
A competent person’s excavation inspection finds evidence of a possible cave-in. What does s. 1926.651(k)(2) require?
What does a "permit application" comprise where a private provider has done the plan review?
A tenant asks the general contractor to begin demolition inside an existing space before the permit is issued. What does s. 553.79(1)(a) provide?
The enforcing agency determines that permitted work is not in conformity with the Florida Building Code. What may it do under s. 553.79(1)(a)?
A permit is denied because the plans are found not to comply. What must the local enforcing agency give the applicant?
What must a request for a certificate of occupancy include on a private provider job?
A rejected payment application is corrected and resubmitted to a city whose charter requires the commission to approve payments. When must the city pay or reject it?