An appraiser estimates that 40 finished lots in a subdivision will sell for $85,000 each. All non-land development, selling and holding costs plus entrepreneurial incentive total $2,100,000. Ignoring the timing of all receipts and payments, what residual remains for the land?
Correct Answer
D) $1,300,000
Gross sellout is 40 × $85,000 = $3,400,000. Subtract the stated total non-land costs and incentive: $3,400,000 − $2,100,000 = $1,300,000. Timing is ignored here. A full subdivision analysis must model absorption, cash-flow timing and appropriately supported returns.
Why This Is the Correct Answer
Option D is correct because gross sellout is 40 x $85,000 = $3,400,000, and subtracting the $2,100,000 of non-land costs and incentive leaves $3,400,000 - $2,100,000 = $1,300,000 for the land. The development method derives land value by deducting total development costs from projected lot sales. Timing is ignored, so this undiscounted residual is the answer.
Why the Other Options Are Wrong
Option A: $5,500,000
Option A, $5,500,000, adds the non-land costs and incentive to the gross sellout ($3,400,000 + $2,100,000) instead of deducting them. Costs reduce what is left for the land, so the residual is $3,400,000 - $2,100,000 = $1,300,000.
Option B: $3,400,000
Option B, $3,400,000, is the gross sellout of 40 x $85,000 before any costs are deducted. Gross retail lot sales are not raw land value; the correct residual is $3,400,000 - $2,100,000 = $1,300,000.
Option C: $2,100,000
Option C, $2,100,000, is the total of non-land costs and entrepreneurial incentive, not the land residual. The land receives what remains after those costs: $3,400,000 - $2,100,000 = $1,300,000.
Sellout minus costs equals land
Think of the land as last in line: lot buyers pay the sellout, the costs and the developer's incentive are paid first, and the land gets the leftover.
How to use: Use this whenever a question gives lot count, lot price and total non-land costs and asks for the land residual.
Exam Tip
Check whether the question says to ignore timing; if it does, a simple subtraction is expected, and if it does not, look for a discounting step.
Common Mistakes to Avoid
- -Reporting gross lot sellout as the land value
- -Adding development costs to the sellout instead of deducting them
- -Treating the total cost figure as the land residual
Concept Deep Dive
Analysis
This question tests the undiscounted subdivision development method for valuing land. First find gross sellout by multiplying the number of lots by the lot price, then subtract all non-land costs and entrepreneurial incentive. Because timing is expressly ignored, no discounting step is needed.
Background Knowledge
The subdivision development method estimates raw land value by projecting the sale prices of finished lots and deducting development, selling and holding costs plus entrepreneurial incentive. A full analysis also models absorption and discounts cash flows for the time value of money; this calculation leaves those steps out.
Real-World Application
A developer asks an appraiser to estimate what a 40-lot tract is worth as raw land. The appraiser projects finished lot prices, deducts site work, marketing, carrying costs and developer profit, and then, in a full report, discounts the cash flows over the expected sellout period.
More Land/Site Questions
How should an appraiser account for a site's access to public sewer compared with competing sites that require septic systems?
Which fact, if supported by competitive-market evidence, most directly supports a unit-price premium for an otherwise comparable site?
A rectangular site's frontage is doubled while its depth is halved, keeping area constant. What is the likely value effect in a retail district?
A downtown site's zoning height limit is reduced from six stories to three. Buyers in this market had been paying for six-story development potential. What effect on land value is most supportable?
A zoning change increases permitted density from four to eight units per acre. What is the likely effect on site value?
Using the allocation method, market evidence supports a typical land-to-total-property-value ratio of 28% for similar improved properties in the subject’s location. An improved comparable sold for $825,000. What land (site) contribution is indicated by applying that ratio?
An appraiser is valuing a vacant site near a landfill. A similar vacant site that is not affected by the landfill sold for $480,000. Paired land sales indicate that proximity to the landfill lowers site prices by $70,000. No other adjustments apply. What is the indicated value of the subject site?
An appraiser is extracting site value from a $600,000 cash sale. The seller's records show an original construction cost of $250,000 and a depreciated book value of $110,000. The appraiser estimates current replacement cost new at $400,000 and accrued depreciation from all causes at $100,000. What is the indicated site value?
Three parcels assembled under single ownership (standard appraisal guidance assemblage) support separate as-is values of $290,000, $340,000, and $250,000. After assemblage for a higher-utility use, the combined site is valued at $1,050,000. Assemblage costs (demolition, legal, holding, and related) total $55,000. What is the indicated net plottage (plottage increment after assemblage costs)?
A comparable commercial site with 65 front feet sold for a cash-equivalent price of $585,000. Per standard appraisal guidance, sale price per front foot is a vacant-land unit of comparison when frontage is a primary value determinant. The subject site has 72 front feet and is otherwise similar. What indicated land value does the front-foot unit support before other adjustments?
People Also Study
Real Estate Market
13.6% of exam
Property Description
11.8% of exam
Sales Comparison Approach
16.4% of exam
Cost Approach
13.6% of exam
Income Approach
8.2% of exam
Previous Question
Additional land is not needed to support the existing improvements and cannot support an independent use or separate sale under the applicable constraints. How is it generally classified?
Next Question
For a vacant site, three reasonably probable uses are legally permissible, physically possible and financially feasible. After accounting for their relevant costs, timing and risk, what distinguishes the highest and best use?
