What information does a structural wood panel grade stamp normally provide?
Correct Answer
B) Panel grade, span rating, thickness, and exposure classification
Structural panel grade stamps identify rating and exposure information needed for proper use.
Why This Is the Correct Answer
Structural panel grade stamps identify rating and exposure information needed for proper use.
Why the Other Options Are Wrong
Option A: Base the wood panel grade stamp response on paint color only
Choice A gives Paint color only. Its specific error: the action skips the timing, documentation, or field-control step needed for Wood panel grade stamp.
Option C: Limit wood panel grade stamp to door hardware schedule
In wood framing, Door hardware schedule is the wrong selection for Wood panel grade stamp: it describes work from another assembly, while the Wood panel grade stamp item is asking for Panel grade, span rating, thickness, and exposure classification.
Option D: Select plumbing fixture count for wood panel grade stamp
The trap in D is Plumbing fixture count. That selection is wrong because the choice would not get the project to Panel grade, span rating, thickness, and exposure classification, which is the Wood panel grade stamp result verified by the source; Wood panel grade stamps identify grade and span-use information.
Memory Technique
Link wood panel grade stamp to its book condition; a different condition means a different answer than Panel grade, span rating, thickness, and exposure classification.
Reference Hint
Open International Building Code wood construction provisions; APA and truss handling practice; use the index entry or section for "APA panel grade stamp" to confirm that Structural panel grade stamps identify rating and exposure information needed for proper use.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass
Related Study Resources
Previous Question
Why does a concrete specification control water-cementitious material ratio rather than judging the mix only by slump?
Next Question
A punched window is set before the sill flashing membrane is lapped into the rough opening. The WRB is already cut around the opening. What should the crew do?