A storm cuts rills down a newly graded slope. What is the appropriate response?
Correct Answer
D) Repair erosion, stabilize the slope, and improve runoff controls.
Erosion damage indicates stabilization and runoff controls are inadequate.
Why This Is the Correct Answer
Erosion damage indicates stabilization and runoff controls are inadequate.
Why the Other Options Are Wrong
Option A: The site crew should wait until final acceptance
Choice A gives Wait until final acceptance. Its specific error: it leaves the work at an informal or incomplete stage, while Erosion after storm requires Repair erosion, stabilize the slope, and improve runoff controls.
Option B: Base the erosion after storm response on blade sediment into the creek
Choice B (Blade sediment into the creek.) is rejected because it points to Blade sediment into the creek. but.
Option C: The site crew should remove all slope drains
In site construction, Remove all slope drains. is the wrong selection for Erosion after storm: it answers the Erosion after storm prompt with the wrong practical move.
Memory Technique
Use the phrase "problem, control, result" for erosion after storm; the result side is Repair erosion, stabilize the slope, and improve runoff controls.
Reference Hint
Open Developing Your Stormwater Pollution Prevention Plan, EPA 833-R-06-004, 2007; use the index entry or section for "EPA 833-R-06-004 - SWPPP development / permit and inspection topics" to confirm that Erosion damage indicates stabilization and runoff controls are inadequate.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?