A soil stockpile is placed beside an unprotected storm inlet. What should be corrected?
Correct Answer
B) Move or stabilize the stockpile and install appropriate perimeter or inlet protection.
Stockpiles near inlets can discharge sediment and need protection or relocation.
Why This Is the Correct Answer
Stockpiles near inlets can discharge sediment and need protection or relocation.
Why the Other Options Are Wrong
Option A: Push the pile into the inlet
In site construction, Push the pile into the inlet. is the wrong selection for Stockpile near inlet: it answers the Stockpile near inlet prompt with the wrong practical move.
Option C: The site crew should leave it uncovered until it rains
Choice C gives Leave it uncovered until it rains. Its specific error: the choice would not get the project to Move or stabilize the stockpile and install appropriate perimeter or inlet protection.
Option D: The site crew should use it as structural backfill without testing
Choice D (Use it as structural backfill without testing.) is rejected because it tries to bypass the Stockpile near inlet checkpoint.
Memory Technique
Picture a ledger line on the jobsite; stockpile near inlet is solved by the action that leads to Move or stabilize the stockpile and install appropriate perimeter or inlet protection.
Reference Hint
Open Developing Your Stormwater Pollution Prevention Plan, EPA 833-R-06-004, 2007; use the index entry or section for "EPA 833-R-06-004 - erosion and sediment controls" to confirm that Stockpiles near inlets can discharge sediment and need protection or relocation.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?